COT 206 Carpentry: Finished Carpentry

Installation of finish materials in residential construction, including sheathing, siding, insulation, stairs, flooring, drywall installation and finishing, as well as miter cuts and installation of crown molding, base molding, casing, wainscot paneling, door installation, window installation and roofing, wall finishing, paint finishes, wall paper and paneling. (Spring 2020) (course fee required)

Credits

3 credits

Last Updated

5/19/2020 12:10:14 AM

Lecture

1

Laboratory

4